Welding robot ROI: how much does preparation cost you?
A robot pays for itself through the time it frees up. In small batches, that time is not the arc, it is preparation. Enter your figures: the calculation runs in your browser, and nothing is sent unless you ask for it.
Preparation costs you today
— per year
— of qualified welder time per month spent preparing, or — per month.
Preparation —Welding —
With a conventional robot
—
per month of programming and jigs for your — part numbers (— of programming).
With an autonomous cell
≈ 0 h
of programming per part number: the program is generated from the STEP file. What remains is loading bins and inspection.
Receive my calculation
We send you the details, with a first reading of your situation by an engineer.
If you attach two or three typical STEP files, we also estimate the cell's cycle time on your parts.
Try it on your real parts
Join the pilot workshop waiting list, or give us a few part numbers to subcontract first.